Yerrakalva Medium Irrigation Project JI00171
# | Attribute | Value |
---|---|---|
1 | Irrigation Project Name | Yerrakalva Medium Irrigation Project |
2 | Irrigation Project Name Alias | |
3 | Purpose | Irrigation |
4 | Type | Medium |
5 | Engineering Type | Storage |
6 | Status | Ongoing |
7 | State | Andhra Pradesh |
8 | Districts Benefited | West Godavari |
9 | Basin | East flowing rivers between Mahanadi and Pennar |
10 | River | Yerrakalva |
11 | Project Sharing | None |
12 | Intercountry | None |
13 | Interbasin | No |
14 | Work Started in 5 Year Plan | V-Plan |
15 | Completed in 5 Year Plan | |
16 | Project Approval Status | Planning Commission |
17 | Year of Approval by Planning Commission | 1993 |
18 | Approved Cost (Rs. in cr) | 46.52 |
19 | Actual Cost (Rs. in cr) | |
20 | Culturable Command Area (CCA) (th ha) | 9.99 |
21 | Ultimate Irrigation Potential (UIP) (th ha) | 9.99 |
22 | Potential Created (PC) (th ha) | |
23 | Project Covered under ERM Scheme | No |
24 | Project Covered under CADA Scheme | No |
25 | Project Covered under AIBP Scheme | Yes |
26 | Studies Conducted | |
27 | Project Covered under Tribal Sub-Plan | |
28 | Project Covered under Drought Prone Area Programme (DPAP) | |
29 | Remarks |
# | Name | Type |
---|---|---|
1 | Yerrakalva Dam | Dam |
Project in Brief
The Yerrakalva Reservoir Project started in 1976 is a medium irrigation project comprising an Earthen Dam formed across the river Yerrakalva near Konguvarigudem village in Jangareddigudem mandal of West Godavari district in Andhra Pradesh. The Yerrakalva river falls into Upputeru and finally empties into Bay of Bengal near Mogultur of West Godavari district. The ayacut proposed to be irrigated by this project is 9,996 ha benefitting 22 villages in Jangareddigudem, Kamavarapukota, Dwaraka Tirumala, Nallajerla and Tadepalligudem mandals of West Godavari District. Besides this, flood moderation is provided for safeguarding the fertile lands of about 8,094 ha between Anantapalli and Nandamuru Aqueduct on both flanks of the rivers.
The project components are as under:
(i) Earthen Dam for a length of 2.73 km.
(ii) Spillway Regulator with Hoist Bridge with 4 Vents of size 12.00 m. x 5.00 m.
(iii) Left and Right Head Sluices at km.0.40 and km.2.20 of Earth Dam respectively.
(iv) Excavation of Left Main Canal (LMC) for a length of 7.59 km. and Right Main Canal (RMC) for a length of 45.60 km. including their distributary network and CM&CD works.
The contemplated ayacut under this project is 24,700 acre (9,996 ha). An extent of 5,000 acre (2,023 ha) on Left Main Canal and 2,500 acre (1,012 ha) upto 2.180 km of Right Main Canal was provided irrigation facilities prior to AIBP assistance. The balance irrigation potential of 17,200 acre (6,960 ha) is proposed under AIBP. Upto March 2010 irrigation potential created is 8095 ha.