Shivana Takli Medium Irrigation Project JI00540

« Go Back

#AttributeValue
1Irrigation Project Name Shivana Takli Medium Irrigation Project
2Irrigation Project Name Alias
3Purpose Irrigation
4Type Medium
5Engineering Type Storage
6Status Ongoing
7State Maharashtra
8Districts Benefited Aurangabad
9Basin Godavari
10River Shivna
11Project Sharing None
12Intercountry None
13Interbasin No
14Work Started in 5 Year Plan VI-Plan
15Completed in 5 Year Plan
16Project Approval Status Planning Commission
17Year of Approval by Planning Commission 1995
18Approved Cost (Rs. in cr) 34.76
19Actual Cost (Rs. in cr)
20Culturable Command Area (CCA) (th ha) 6.39
21Ultimate Irrigation Potential (UIP) (th ha) 6.39
22Potential Created (PC) (th ha)
23Project Covered under ERM Scheme No
24Project Covered under CADA Scheme No
25Project Covered under AIBP Scheme Yes
26Studies Conducted
27Project Covered under Tribal Sub-Plan No
28Project Covered under Drought Prone Area Programme (DPAP) Yes
29Remarks
#NameType
1Shivana Takli DamDam

Project in Brief

The Shivna Takli Medium Irrigation Project is constructed in the Godavari basin in Aurangabad district of Maharashtra. The project comprises of 4408 m long earth dam with the maximum height of 14.77 m and 172 m long masonry dam having maximum height of 29.50 m with 78 m long spillway across river Shivna near Takli village in Kannad Taluka of Aurangabad district. The canal system consists of 10.53 km long Left Bank Canal (LBC) to irrigate 2320 ha of Irrigable Command Area (ICA) and 56.20 km long Right Bank Canal (RBC) to cover the Irrigable Command Area (ICA) of 4069 ha. The project on completion will create the annual ultimate irrigation potential of 6389 ha in Kannad and Vaijapur Talukas of Aurangabad district. The project will also provide 3.591 Mm3 water for domestic use for 40 villages in Aurangabad district. The CCA of the project is also 6389 hectare.

The project was approved by the Planning Commission, Govt. of India for an estimated cost of Rs. 34.76 crore in 1995. The construction work on the project started in 1982. In the year 2004-05 the project was brought under AIBP. The project is completed during 2008-09 and the Latest estimmated cost of the whole project is 123.12 crore.

Command Area Map

800px-shivana_dam.jpg