Sarangkheda Barrage Medium Irrigation Project JI00608
# | Attribute | Value |
---|---|---|
1 | Irrigation Project Name | Sarangkheda Barrage Medium Irrigation Project |
2 | Irrigation Project Name Alias | |
3 | Purpose | Irrigation |
4 | Type | Medium |
5 | Engineering Type | Diversion |
6 | Status | Completed |
7 | State | Maharashtra |
8 | Districts Benefited | Dhule,Nandurbar |
9 | Basin | Tapi |
10 | River | Tapi |
11 | Project Sharing | None |
12 | Intercountry | None |
13 | Interbasin | No |
14 | Work Started in 5 Year Plan | IX-Plan |
15 | Completed in 5 Year Plan | XII-Plan |
16 | Project Approval Status | Planning Commission |
17 | Year of Approval by Planning Commission | 2007 |
18 | Approved Cost (Rs. in cr) | 202.47 |
19 | Actual Cost (Rs. in cr) | |
20 | Culturable Command Area (CCA) (th ha) | 9.74 |
21 | Ultimate Irrigation Potential (UIP) (th ha) | 11.32 |
22 | Potential Created (PC) (th ha) | 11.32 |
23 | Project Covered under ERM Scheme | No |
24 | Project Covered under CADA Scheme | No |
25 | Project Covered under AIBP Scheme | Yes |
26 | Studies Conducted | |
27 | Project Covered under Tribal Sub-Plan | No |
28 | Project Covered under Drought Prone Area Programme (DPAP) | Yes |
29 | Remarks |
# | Name | Type |
---|---|---|
1 | Sarangkheda Barrage | Barrage/ Weir/ Anicut (BWA) |
The Sarangkheda Barrage Medium Irrigation Project is constructed in the Tapi basin in Nandurbar district of Maharashtra. The project comprises of 484.50 m long barrage with weir of the maximum height of 11 m having 26 vertical lift gates each of size 15 m x 11 m across river Tapi near village Sarangkheda, Taluka Shahada in district Nandurbar. The clear waterway provided in the barrage is 390 m to pass design flood of 50529 m3/s at u/s HFL of 132.93 m. The storage created by the construction of this barrage will provide water to irrigate the culturable command area (CCA) of 9742 ha in 5 villages of Shahada Taluka of Nandurbar district and 24 villages of Shindkheda Taluka in Dhule district. The lifting of water and its distribution will be done by the farmers through the co-operative and private lift irrigation schemes. 85.915% command area of this project lies in DPAP area. The ultimate irrigation potential of the project is 11519 ha. The project will also provide 3.57 Mm3 water for domestic use for Dondaicha and other nearby villages and 0.19 Mm3 of water for industrial requirements of the industries in Shahada Taluka.
The construction of civil works of the project was started in April 1999 and the mechanical works started in August 2002. The project was approved by the Planning Commission, Govt. of India for an estimated cost of Rs. 202.47 crore at 1999-2000 price level in December 2007.
The balance works of the main barrage; RCC deck bridge & approach road; mechanical work of gates; and other miscellaneous works of the project were included in AIBP during 2007-08. At the time of inclusion of the project under AIBP, 95% main barrage, 43% deck bridge & approach road, 80% mechanical works and 30% misc. works were complete. The balance works of the project to create the ultimate irrigation potential of 11519 ha were included under AIBP. The project is completed during 2009-10 and full potential is created.