Jawahar Lal Nehru Lift Irrigation Project JI01670

« Go Back

#AttributeValue
1Irrigation Project Name Jawahar Lal Nehru Lift Irrigation Project
2Irrigation Project Name Alias JLN Lift (inc. JhajjahrLift)
3Purpose Irrigation
4Type Major
5Engineering Type Lift
6Status Completed
7State Haryana
8Districts Benefited Jhajjar,Gurgaon,Bhiwani,Rewari,Mahendragarh
9Basin Ganga, Area of inland drainage of Rajasthan
10River
11Project Sharing None
12Intercountry None
13Interbasin No
14Work Started in 5 Year Plan V-Plan
15Completed in 5 Year Plan XII-Plan
16Project Approval Status Planning Commission
17Year of Approval by Planning Commission 1976
18Approved Cost (Rs. in cr) 40.3
19Actual Cost (Rs. in cr)
20Culturable Command Area (CCA) (th ha) 249.9
21Ultimate Irrigation Potential (UIP) (th ha) 154.64
22Potential Created (PC) (th ha) 154.64
23Project Covered under ERM Scheme No
24Project Covered under CADA Scheme Yes
25Project Covered under AIBP Scheme Yes
26Studies Conducted
27Project Covered under Tribal Sub-Plan
28Project Covered under Drought Prone Area Programme (DPAP) Yes
29Remarks
#NameType
1Alipur Minor-PH 1Lift
2Ateli Minor-PH 1Lift
3Ateli Minor-PH 2Lift
4Budhi Pur-PH 1Lift
5Dewana distributary-PH 10Lift
6Dewana distributary-PH 1Lift
7Dewana distributary-PH 2Lift
8Dewana distributary-PH 3Lift
9Dewana distributary-PH 4Lift
10Dewana distributary-PH 5Lift
11Dewana distributary-PH 6Lift
12Dewana distributary-PH 7Lift
13Dewana distributary-PH 8Lift
14Dewana distributary-PH 9Lift
15Dhancholi Minor-PH 1Lift
16Dhancholi Minor-PH 2Lift
17Gehli Distributary-PH 1Lift
18Gehli Distributary-PH 2Lift
19Gehli Distributary-PH 3Lift
20Gopal Minor-PH 1Lift
21Gopal Minor-PH 2Lift
22Hasanpur distributary-PH 1Lift
23Hasanpur distributary-PH 1Lift
24Hasanpur distributary-PH 2Lift
25Hasanpur distributary-PH 2Lift
26Hasanpur distributary-PH 3Lift
27Hasanpur distributary-PH 3Lift
28Jawarhar Lal Nehru Lift Station JLN Canal - IIILift
29Jawarhar Lal Nehru Lift Station JLN Canal - IILift
30Jawarhar Lal Nehru Lift Station JLN Canal - IVLift
31Jawarhar Lal Nehru Lift Station JLN Canal - ILift
32Jawarhar Lal Nehru Lift Station JLN Canal - VIILift
33Jawarhar Lal Nehru Lift Station JLN Canal - VILift
34Jawarhar Lal Nehru Lift Station JLN Canal - VLift
35Jawarhar Lal Nehru Lift Station JLN Canal VIIILift
36Jawarhar Lal Nehru Lift Station JLN Feeder - IILift
37Jawarhar Lal Nehru Lift Station JLN Feeder - ILift
38Jawarhar Lal Nehru Lift Station Madhogarh BranchLift
39Jawarhar Lal Nehru Lift Station Madhogarh BranchLift
40Jawarhar Lal Nehru Lift Station Madhogarh BranchLift
41Jawarhar Lal Nehru Lift Station Madhogarh BranchLift
42Jawarhar Lal Nehru Lift Station MohindergarhLift
43Jawarhar Lal Nehru Lift Station MohindergarhLift
44Jawarhar Lal Nehru Lift Station MohindergarhLift
45Jawarhar Lal Nehru Lift Station MohindergarhLift
46Jawarhar Lal Nehru Lift Station MohindergarhLift
47Jawarhar Lal Nehru Lift Station Narnaul Branch -Lift
48Jawarhar Lal Nehru Lift Station Narnaul Branch -Lift
49Jawarhar Lal Nehru Lift Station Narnaul Branch -Lift
50Jawarhar Lal Nehru Lift Station Narnaul Branch -Lift
51Jawarhar Lal Nehru Lift Station Narnaul Branch -Lift
52Jawarhar Lal Nehru Lift Station Narnaul Branch -Lift
53Jawarhar Lal Nehru Lift Station Satnali Feeder -Lift
54Jawarhar Lal Nehru Lift Station Satnali Feeder -Lift
55Jawarhar Lal Nehru Lift Station Satnali Feeder -Lift
56Jawarhar Lal Nehru Lift Station Satnali Feeder -Lift
57Jawarhar Lal Nehru Lift Station Satnali Feeder -Lift
58Jawarhar Lal Nehru Lift Station Satnali Feeder -Lift
59Khamania Minor-PH 1Lift
60Kheri Minor-PH 1Lift
61Laduwas distributary-PH 1Lift
62Madogarh Distributary-PH 1Lift
63Madogarh Distributary-PH 2Lift
64Madogarh Distributary-PH 3Lift
65Madogarh Distributary-PH 4Lift
66Mohindergarh - PH 1Lift
67Mohindergarh - PH 2Lift
68Mohindergarh - PH 3Lift
69Mohindergarh - PH 4Lift
70Mohindergarh - PH 5Lift
71Mohindergarh - PH 6Lift
72Narnaul Distributary - PH 1Lift
73Narnaul Distributary-PH 2Lift
74Nolpur distributary-PH 1Lift
75Nolpur distributary-PH 2Lift
76Nolpur distributary-PH 3Lift
77Nolpur distributary-PH 4Lift
78Nolpur distributary-PH 5Lift
79Nolpur distributary-PH 6Lift
80Nolpur distributary-PH 7Lift
81Nolpur distributary-PH 8Lift
82Nolpur distributary-PH 9Lift
83R C PH 1Lift
84R C PH 2Lift
85Ram Pura-PH 1Lift
86Rasauli distributary-PH 1Lift
87Shahbazpur distributary-PH 1Lift
88Shahbazpur distributary-PH 2Lift
89Shahbazpur distributary-PH 3Lift
90Shahbazpur distributary-PH 4Lift
91Shahbazpur distributary-PH 5Lift

Project in Brief

JLN lift irrigation scheme, estimated to have cost nearly 165.0 crore, comprises of JLN feeder; JLN canal; Mohindergarh canal alongwith Narnaul branch; Satnali feeder alongwith Madogarh branch and a large number of network of distributaries and minors. The water is lifted against the reverse slope of the country at pump houses with intercept the alignments of the channels at approporiate intervals. 92 pump houses are constructed out of 98 pumps planned. Pump house JF-I is the first lifting stations at 96.646 km of JLN feeder where water is lifted by 3.88 meter. Pump House JF-2 at the tail end of JLN feeder at 104.57 km is the major lift which feeds JLN canal, Mohindergarh canal, Jakhla Distributary, Amboli distributary.


1. JLN Feeder: JLN feeder takes off from Jhubro headworks at the end of Delhi branch of western Jamuuna canal which tails at Munak and bifurcates into Hansi branch ad Delhi branch. The feeder is 104.57 km long and has a head discharge capacity of 91.78 cumec.

2. Mohindergarh Canal: It is 31.30 km long with head discharge capacity of 47.86 cumec and has five pump houses installed at designated locations. It bifurcates at the tail into Narnaul branch and Mohindergarh distributary.

3. Narnaul Branch: It is 29.50 km long with head discharge capacity of 26.05 cumec. It has 6 number of pumps installed at different locations along the canal.

4. Satnali Feeder: The canal takes off from downstream pump house number 2 of Mohindergarh canal. It has designed discharge capacity of 8.277 cumec and is 36.523 km long and has 6 number of pump houses installed at different locations.

5. Madogarh Branch: The canal takes off from the tail of Satnali feeder with design discharge capacity of 4.45 cumec and is 10.836 km long and four pump houses.

6. JLN Canal: The canal is 53 km long and head discharge capacity of 25.75 cumec and has seven number of pump houses.


The CCA of the project is 2,49,901 hectare and Ultimate irrigation potential is 1,54,640 hectare. The project was started during 1974-75 and is completed during XI plan


Print/export
QR Code
QR Code jawahar_lal_nehru_lift_irrigation_project_ji01670 (generated for current page)