Gollavagu Medium Irrigation Project JI00078

« Go Back

#↓Attribute↓Value↓
1Irrigation Project Name Gollavagu Medium Irrigation Project
2Irrigation Project Name Alias Golavagu
3Purpose Irrigation
4Type Medium
5Engineering Type Diversion
6Status Ongoing
7State Telangana
8Districts Benefited Adilabad
9Basin Godavari
10River Gollavagu
11Project Sharing None
12Intercountry None
13Interbasin No
14Work Started in 5 Year Plan X-Plan
15Completed in 5 Year Plan
16Project Approval Status
17Year of Approval by Planning Commission 2004
18Approved Cost (Rs. in cr) 84.08
19Actual Cost (Rs. in cr)
20Culturable Command Area (CCA) (th ha) 3.84
21Ultimate Irrigation Potential (UIP) (th ha) 3.84
22Potential Created (PC) (th ha)
23Project Covered under ERM Scheme No
24Project Covered under CADA Scheme No
25Project Covered under AIBP Scheme Yes
26Studies Conducted
27Project Covered under Tribal Sub-Plan
28Project Covered under Drought Prone Area Programme (DPAP)
29Remarks
#↓Name↓Type↓
1Gollavagu WeirBarrage/ Weir/ Anicut (BWA)

Project in brief

The project is situated in Adilabad district of Andhra Pradesh state. The project as approved by Planning Commission envisages construction of headworks comprising earthen dam of length 2.400 km including Ogee Weir of length 150.00 m to dispose of the design discharge of 903 cumec and Right Flank Canal of 26 km to create an irrigation potential of 3,845 hectare with head discharge capacity of 2.65 cumec. CCA of the project is also 3845 hectare.

The project was approved by Planning Commission, Water Resource Division in the year 2006 for Rs.83.61 cr vide Planning Commission Lr. No.20(1)/2006-WR, dt. 27.06.2006. The project was included under AIBP during the year 2006-07.


Print/export