Anjunem Medium Irrigation Project JI02889

« Go Back

#AttributeValue
1Irrigation Project Name Anjunem Medium Irrigation Project
2Irrigation Project Name Alias
3Purpose Irrigation
4Type Medium
5Engineering Type Storage
6Status Completed
7State Goa
8Districts Benefited North Goa
9Basin West flowing rivers from Tapi to Tadri
10River Mandovi
11Project Sharing None
12Intercountry None
13Interbasin No
14Work Started in 5 Year Plan V-Plan
15Completed in 5 Year Plan VII-Plan
16Project Approval Status
17Year of Approval by Planning Commission 1977
18Approved Cost (Rs. in cr) 3.68
19Actual Cost (Rs. in cr) 22.33
20Culturable Command Area (CCA) (th ha) 2.1
21Ultimate Irrigation Potential (UIP) (th ha) 4.62
22Potential Created (PC) (th ha) 4.62
23Project Covered under ERM Scheme Yes
24Project Covered under CADA Scheme Yes
25Project Covered under AIBP Scheme No
26Studies Conducted
27Project Covered under Tribal Sub-Plan
28Project Covered under Drought Prone Area Programme (DPAP)
29Remarks
#NameType
1Anjunam DamDam
2Pick up Weir - AnjunemBarrage/ Weir/ Anicut (BWA)

Project Description

The Anjunem Irrigation Project is located on Costi nadi at Anjunem village in Sattari Taluka of North Goa District, a tributary of Valvanti River under Madei Basin. The dam is located between 15 36'57“ to 15 33'30” latitude and 74 5'22“ to 73 58'30” longitude. The Anjunem Irrigation Project is a medium irrigation project completed in 1989 and the ultimate potential is 4625 Ha with CCA as 2100 Ha and ICA is 1968. The project envisages construction of:

  1. Gravity Masonry Dam with length of 176.0 meter and height is 42.80 meter. The length of spillway is 39.48 meter having 4 number of radial gates of size 7.62 x 6.85 meter size to pass design flood of 487 cumec.
  2. Pick up Weir, 1 km downstream of dam, 50 meter long
  3. Two canals, one on the right bank and one on the left bank taking of from the weir. The left bank is 15.5 km with head discharge capacity of 1.03 cumec. The RBC is 25 km with head discharge capacity of 1.64 cumec.

The project was approved by Planning Commission in the year 1977 for an estimated cost of Rs 3.68 crore.